点评:It goes against my better judgement to write a disappointing review for a service such as this. However, having purchased our tickets online the day before, we dutifully arrived at the ticket office in good time for our 11am departure. Only then did I happen to see a sign that said most of the track had been handed over to the National Grid for a period of time starting from 7 September 2025 while they carried out work. Anyway, we boarded the train and we set off to the next stop where they changed the engine round and we headed back to where we started. The whole journey lasted about 15 minutes, which included 5 minutes waiting for them to change the engine. At no point were we adjacent to the lake. Although the tickets were not expensive, I felt very disappointed that we did not get to see the lake from the train, unless you strained your eyes at the stop. I am certain that when the service is running normally, then it is am amazing experience, but not today
翻译:为这样的服务写一篇令人失望的评论,这违背了我的良知。不过,由于前一天在网上购票,我们准时到达售票处,赶上了上午11点的出发。直到那时,我才偶然看到一个标志,上面写着大部分轨道已移交给国家电网,自2025年9月7日起,将进行一段时间的维护工作。总之,我们登上了火车,前往下一站,在那里他们更换了引擎,然后我们回到了出发地。整个旅程持续了大约15分钟,其中包括5分钟等待更换引擎的时间。我们一路上都没有靠近湖边。虽然车票不贵,但我还是很失望,因为我们没能在火车上看到湖景,除非你在车站的时候眼睛眯得厉害。我敢肯定,当列车正常运行时,这绝对是一次很棒的体验,但今天不行。